Quantcast
Channel: Pdf Repair Manual Download » Search Results » vacuum hose routing ford ranger diagram
Viewing all articles
Browse latest Browse all 10

2006 Ford Five Hundred SE UPPER INTAKE MANIFOLD REMOVAL AND INSTALLATION MANUAL

$
0
0

download
Removal All vehicles 1. Drain the cooling system. For additional information, refer to DRAINING . 2. Disconnect the battery ground cable. For additional information, refer to REMOVAL AND INSTALLATION . 3. Remove the air cleaner outlet pipe. For additional information, refer to REMOVAL AND INSTALLATION . 4. Remove the 4 transaxle roll restrictor cross brace bolts 5. Remove the bolt and the transaxle roll restrictor cross brace. 6. Disconnect the evaporative emissions (EVAP) canister purge valve tube from the upper intake manifold and detach the retainer. 7. Disconnect the positive crankcase ventilation (PCV), brake booster and vacuum harness tubes from the upper intake manifold. 8. Detach the fuel tube retainer from the upper intake manifold. 9. Disconnect the exhaust gas recirculation (EGR) system module electrical connector and vacuum tube. 10. Detach the vacuum tube from the upper intake manifold vacuum tube retainer. 11. Disconnect the EGR system module tube from the EGR system module. Early build 12. Disconnect and plug the throttle body and PCV coolant hoses. Late build 13. Disconnect and plug the 2 PCV coolant hoses. All vehicles 14. Disconnect the throttle body electrical connector. 15. If equipped, remove and discard the 4 upper-to-lower intake manifold screws. 16. Remove the 8 bolts and the upper intake manifold. * Remove and discard the gaskets. Installation All vehicles Fig. 4: Identifying Tightening Sequence Of Bolts Courtesy of FORD MOTOR CO. NOTE: Clean and inspect all sealing surfaces. Install new gaskets 1. Position the upper intake manifold and install the 8 bolts. * Tighten in the sequence shown to 10 N.m (89 lb-in). 2. Connect the throttle body electrical connector. Late build 3. Connect the 2 PCV coolant hoses. Early build 4. Connect the throttle body and PCV coolant hoses. All vehicle 5. Connect the EGR system module tube to the EGR system module. * Tighten to 40 N.m (30 lb-ft). 6. Attach the vacuum tube to the upper intake manifold vacuum tube retainer. 7. Connect the EGR system module electrical connector and vacuum tube. 8. Attach the fuel tube retainer to the upper intake manifold. 9. Connect the PCV, brake booster and vacuum harness tubes to the upper intake manifold. 10. Connect the EVAP canister purge valve tube to the upper intake manifold and attach the retainer. 11. Clean the 4 transaxle roll restrictor cross brace bolts using a wire brush and apply new threadlock to the threads. 12. Position the transaxle roll restrictor cross brace and install the 4 new bolts. * Tighten to 55 N.m (41 lb-ft). 13. Clean the transaxle roll restrictor cross brace-to-roll restrictor bolt using a wire brush and apply new threadlock to the threads. 14. Install a new transaxle roll restrictor cross brace-to-roll restrictor bolt. * Tighten to 48 N.m (35 lb-ft). 15. Install the air cleaner outlet pipe. For additional information, refer to REMOVAL AND INSTALLATION . 16. Connect the battery ground cable. For additional information, refer to REMOVAL AND INSTALLATION . 17. Fill and bleed the cooling system.

Related Content:

ford five hundred roll restrictor bushing diy, ford five hundred throttle body repair, fuel filler tube diagrams chevy impala 2003, pcv valve 3 0 ford aerostar where does small vacuum connection on pcv valve go

Viewing all articles
Browse latest Browse all 10

Trending Articles